USB-C chargers that adjust their output voltage to the device they power are now standard with phones and laptops, and the same idea is spreading into tools, lighting, medical devices and industrial equipment. For a factory that builds chargers, or adds a USB-C power port to its own product, the bill of materials covers far more than a USB controller. This article walks through a USB Power Delivery (USB PD) charger from AC input to USB-C port and points out the parts that decide its size, efficiency, approvals and availability.
How USB PD works
USB PD lets a charger and a device agree on voltage and current over the CC wire of the USB-C cable. The charger starts at 5 V; after negotiation it can raise its output to fixed levels such as 9, 15 or 20 V, at up to 3 A, or 5 A with an electronically marked cable, for up to 100 W. The programmable power supply (PPS) option lets a phone request small voltage steps for faster, cooler charging. The latest revision of the specification extends the range to 240 W with higher voltages, but most products on sale stay within 100 W.
The chain of parts

Input and filtering
A fuse protects the input, often with an NTC thermistor to limit inrush current and a varistor to clamp surges. An EMI filter of X capacitors and a common-mode choke keeps switching noise off the mains; see our note on common-mode chokes and EMI filters. A bridge rectifier and a high-voltage bulk electrolytic capacitor follow. That capacitor is often the largest part in the charger and sets much of its height.
Power factor correction
Above 75 W, chargers sold in markets that apply IEC 61000-3-2, such as the EU, must meet harmonic current limits, so higher-power designs add a PFC stage: usually a boost converter with its own controller, switch, diode and inductor. Smaller chargers normally do without one.
The main converter
Most chargers up to around 100 W use a flyback converter. The quasi-resonant flyback is the common choice, while the active-clamp flyback recovers energy from the transformer’s leakage inductance and suits higher switching frequencies. The primary controller drives the main switch, either a high-voltage silicon superjunction MOSFET or a GaN transistor. GaN chargers have been on sale for several years: GaN switches lose less energy at high frequency, so the transformer and filters can shrink. The trade-offs in choosing a switch are covered in MOSFET selection basics.
Transformer and isolation
The transformer provides the safety isolation between the mains and the USB port. Insulation, creepage and clearance decide whether the charger passes its safety tests, and many designs use triple-insulated wire or planar windings. A safety-rated Y capacitor across the barrier reduces EMI, and an optocoupler or another isolated path carries the feedback signal back to the primary side.
Secondary side and the PD controller
A synchronous rectifier, a low-voltage MOSFET driven by an SR controller, replaces the output diode and cuts losses. Low-ESR polymer capacitors smooth the output. The PD controller handles negotiation on the CC lines, sets the output voltage through the feedback loop, and switches VBUS through a MOSFET so that the port stays off until a device is attached. It also provides over-voltage, over-current and over-temperature protection, often with an NTC sensor, while a TVS diode guards the port against transients. Many controllers also support older fast-charging protocols, and multi-port chargers add power sharing between ports.
Approvals and efficiency
- Safety: IEC 62368-1, which has replaced IEC 60950-1 in most markets, plus national marks.
- EMC: conducted and radiated emission limits such as CISPR 32.
- Efficiency: external power supply rules such as US DoE Level VI and the EU ecodesign regulation; we covered Level VI efficiency when it took effect.
- USB-IF certification: compliance testing and the logo for PD products.
- Rules ahead: the European Commission proposed in September 2021 to make USB-C the common charging port for phones and similar devices, and the proposal is still going through the EU legislative process.
What to watch when sourcing
- Controllers are specific. Primary, SR and PD controllers are rarely pin-compatible across manufacturers, so a change usually means a layout change and new approvals.
- GaN parts are newer. There are fewer manufacturers and fewer equivalents; check lifecycle and second-source options at the design stage.
- Power parts have been short. High-voltage MOSFETs, controllers and PD ICs have had long lead times; see power semiconductor lead times.
- Safety-critical parts are listed parts. Transformers, Y capacitors, optocouplers, fuses and the enclosure material appear in the safety report, so a substitute needs re-evaluation.
- Firmware is part of the part. Many PD controllers are programmed, so record the firmware version and configuration with the part number.
How Strade can help
Power products are Strade’s core group. We supply power semiconductors, controllers, passive components and protection parts for chargers and power supplies, alongside other semiconductors and connectors. Our engineers can check a charger BOM line by line and, when a part is short or end of life, propose alternates with matching specifications for your team to approve. See our power products range, or send your charger BOM and our sales team will reply with a quotation.



