Cart

Your cart is empty.

Add part numbers from the catalogue, or type any part number in the cart, even one that is not listed here.

Browse products
    Request a quotationView cart

    No prices online and no payment here. Our sales team replies by email with price and lead time.

    How to Prepare a BOM for a Fast Quotation: Required Columns and Common Mistakes

    Slow quotations usually come from a BOM that needs several rounds of questions. The required columns, the best file format and the mistakes to fix before sending.

    How to prepare a BOM for a fast quotation

    Share

    A slow quotation is rarely the supplier being lazy. The cause is usually in the BOM itself: a missing manufacturer name, a part number with its suffix cut off, a quantity that could be per board or per build. Every unclear point means another email round, and every round can cost a day. This article lists the required columns, the useful ones, and the common mistakes to fix before you send a BOM for a quotation.

    Required columns

    • Line number: so both sides can refer to the same line.
    • Full manufacturer part number (MPN), including the package, temperature grade and packing suffixes. One wrong character can mean a different package or grade.
    • Manufacturer name, in its own column.
    • Quantity to buy: state that it is the total for this purchase. If you only have the quantity per board, add the number of boards to build.

    Leave out any of these four and the supplier will almost certainly come back with questions. A complete line looks like this:

    LineMPNManufacturerQuantityDescriptionAlternates accepted
    1GRM188R71H104KA93DMurata12,000Ceramic capacitor 100 nF 50 V X7R 0603Yes
    2TPS54331DRTexas Instruments3,000Buck regulator, SOIC-8, tape and reelNo

    Two lines like these can be quoted without a single question.

    Useful columns

    • Description or value: makes typing errors in the part number easy to spot.
    • Package: to cross-check against the part number.
    • Reference designators: if you want an engineer to review the BOM or propose alternates.
    • Alternates accepted or not: line by line; some lines can change, others must stay as specified.
    • Date needed: by batch, if production runs in several batches.
    • Annual demand or batch plan: helps the supplier quote sensible quantity breaks.
    • Your internal part number: for matching at ordering and receiving.
    • Document and quality requirements: CoC, C/O, industrial or automotive grade.

    File format

    • Excel or CSV is easiest; PDF works if it is exported from software, not a scanned image.
    • One part per line; no merged cells; never several part numbers in one cell.
    • Quantities as plain numbers, without words such as “about” or “pcs” in the same cell.
    • If the file has several sheets, say which one needs quoting.
    • Put a date or version number in the file name, so a resent BOM is never confused with an old one.

    Common mistakes

    • No manufacturer name, only a part number.
    • Part numbers without suffixes, or only a generic description such as “100nF 0603 capacitor”.
    • The letter O typed for zero, or I for one.
    • The same part on several lines without combined quantities.
    • Quantity per board confused with total quantity.
    • Do-not-place (DNP) lines left in the list to be quoted.
    • Electronic components mixed with bare PCBs, enclosures and mechanical items that do not need quoting together.
    • Discontinued parts that were never updated in the BOM.
    • Several versions of the BOM sent without saying which one is current.

    Clean data saves time at every step of digital purchasing, as our article on electronic supply chain management explains, and it is also what makes automated BOM tools useful, as covered in AI in the electronic supply chain.

    Tips for a faster quotation

    • Mark the urgent lines, or the ones stopping production, so they are handled first.
    • State your alternates policy from the start.
    • Share the production schedule so the supplier can pick sources that meet your dates.
    • If you need prices at several quantities, list them in the file.
    • Give the name and phone number of one technical contact, so questions about part numbers get answered quickly.

    How Strade receives a BOM

    You can upload a BOM in Excel, CSV or PDF, or enter part numbers line by line on our request for quotation page. No fixed template is needed, but an Excel template is available to download. Tick the box to ask an engineer about alternates if you want proposals; leave it unticked and you are quoted on the original part numbers only. After you send, an RFQ number appears on screen and in a confirmation email with a copy of your list. The quotation comes by email, with price and lead time for each line, in the currency you chose. See how we work with factories and manufacturers and with projects and contractors.

    Back to all news

    Services

    How Strade can help

    Request a quote for your part list

    Send the part numbers and quantities you need and our sales team will prepare a quotation.

      Excel, CSV or PDF, up to 2 MB.

      Download the Excel template